Structural Pest Control and Pesticides - 2025 Structural Rules Revisions

Nine Structural Pest Control Rules & Regulations were amended and published with an effective date of February 1, 2025.  The following Rules were amended:

Affected Rules

License & CA Required C&T Training

All Structural Pest Control licensees and certified applicators are required to watch this 52-minute video before the end of their five-year recertification period. If your credential’s five-year renewal period ends on June 30, 2026 you will have until June 30, 2027 to complete the required video. Note: This is not the video required by the NCDA&CS Structural Pest Control & Pesticides Division-Pesticides Section.

NCDA&CS Structural Pest Control Required C&T Standards Update Training Submission Form 

(You are required to watch the entire video prior to completing this form.)
  • Note: This is not the video required by the NCDA&CS Structural Pest Control & Pesticides Division-Pesticides Section. If you hold a credential from the Pesticides Section, you must watch their required video at: Pesticide C&T Update Training

Annual Registered Technician Training Video

NC Edited PERC training for non-certified applicators to address new Registered Technician training requirements. This training MUST be overseen by a certified individual.

Annual Registered Technician Training Completion Certificate

(You are required to watch the entire video prior to completing this certificate.)

Structural Rules Revision Information Session Video

Video of the Raleigh Structural Pest Control Rule Revision Information Session (May 21, 2025)

On This Page Jump Links
Off