Soil & Water - ACSP FY27 Cost List

Agriculture Cost Share Program

FY2027 Cost List

FY2027 Agriculture Cost Share Program Cost List

Agrichemical Pollution Prevention
Component Unit Type WESTERN REGION Unit Cost CENTRAL REGION Unit Cost EASTERN REGION Unit Cost Maximum Cost Share 75 Percent Maximum Cost Share 90 Percent Cost Type
ABANDONED TREE REMOVAL Acre Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $930.00 $1,116.00 Actual
AGRICHEMICAL CONTAINMENT AND MIXING FACILITY Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $24,750.00 $29,700.00 Actual
AGRICHEMICAL HANDLING FACILITY-building-incl. plumbing, electrical, and misc SqFt $65.25 $ - $ - Average
Agrichemical Handling Facility-chemical storage - including block, sealant, perlite, and platform SqFt $71.25 $ - $ - Average
AGRICHEMICAL MIXING STATION - Portable Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $5,950.00 $7,128.00 Actual
AGRICHEMICAL FACILITY-PUMP- housing, fiberglass/site built Each $560.00 $ - $ - Average
AGRICHEMICAL FACILITY-PUMP- solar powered water supply Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $5,340.00 $6,420.00 Actual
AGRICHEMICAL FACILITY-PUMP- water supply Each Cost Share percent of actual amount Cost Share percent of actual amount Cost Share percent of actual amount $4,100.00 $4,920.00 Actual
AGRICHEMICAL FACILITY-WATER SUPPLY municipal tap Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $2,632.00 $3,158.00 Actual
AGRICHEMICAL FACILITY- WELL construction/head protection LinFt $27.00 $30.00 $27.00 $ - $ - Average
AGRICHEMICAL FACILITY- WELL permit (only where agriculture is not exempt from well permit fees) Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $500.00 $600.00 Actual
AGRICHEMICAL FACILITY- WELL Steel casing LinFt Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $25.00 $30.00 Actual
CHEMIGATION/FERTIGATION BACKFLOW PREVENTION SYSTEM Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $2,411.00 $2,893.50 Actual
PRECISION AGRICHEMICAL APPLICATION TIER-1. GPS Guidance Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $2,850.00 $3,420.00 Actual
PRECISION AGRICHEMICAL APPLICATION TIER-2. Automatic Application Rate Control Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $2,528.00 $3,034.00 Actual
PRECISION AGRICHEMICAL APPLICATION TIER-3. Boom Section Control Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $2,670.00 $3,204.00 Actual
Construction and Building Materials (Bricks, Concrete, Lumber, Ponds, Stream Restoration, Micro-Irrigation)
Component Unit Type WESTERN REGION Unit Cost CENTRAL REGION Unit Cost EASTERN REGION Unit Cost Maximum Cost Share 75 Percent Maximum Cost Share 90 Percent Cost Type
ABANDONED WELL CLOSURE Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $2,010.00 $2,412.00 Actual
AGRICULTURAL POND - Sediment Removal Only Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $8,311.00 $9,973.00 Actual
Agricultural Pond Repair/Retrofit Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $43,500.00 $52,200.00 Actual
Agricultural Pond Repair/Retrofit Engineering- Embankment, intermediate or high hazard Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $10,000.00 $12,000.00 Actual
Agricultural Pond Repair/Retrofit Engineering- Embankment, low hazard Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $7,500.00 $9,000.00 Actual
AGRICULTURAL WATER COLLECTION SYSTEM Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $15,000.00 $18,000.00 Actual
DEWATERING Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $3,750.00 $4,500.00 Actual
BRICK-8" Each $0.94 $ - $ - Average
CATCH BASIN Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $2,815.00 $3,378.00 Actual
CLEARING-removing woods Acre $5,617.75 $ - $ - Average
CONCRETE BLOCK-6" or 8" Each $5.25 $ - $ - Average
CONCRETE BLOCK-12" Each $5.75 $ - $ - Average
CONCRETE-non-reinforced <= 5 CuYd CuYd $715.00 $ - $ - Average
CONCRETE-non-reinforced > 5 CuYd CuYd $657.00 $ - $ - Average
CONCRETE-Reinforced (WW or Fiber - does not include rebar) CuYd $721.00 $ - $ - Average
FENCE-silt, install/maintain LinFt $4.00 $ - $ - Average
FILTER CLOTH-geotextile fabric SqYd $4.50 $ - $ - Average
GRATE-removable 24" frame & grate Each $517.50 $ - $ - Average
GRATE-removable 30" frame & grate Each $700.25 $ - $ - Average
GRATE-removable 36" frame & grate Each $883.00 $ - $ - Average
GUTTERS-assembled alum/vinyl 5" LinFt $6.75 $ - $ - Average
GUTTERS-assembled alum/vinyl 6" LinFt $9.00 $ - $ - Average
GUTTERS-downspouts LinFt $5.50 $ - $ - Average
GUTTERS-seamless alum 5" LinFt $11.00 $ - $ - Average
GUTTERS-seamless alum 6" LinFt $17.00 $ - $ - Average
JUNCTION BOX-concrete Each $299.25 $ - $ - Average
LUMBER-post, pressure treat 4" x 4" LinFt $4.50 $ - $ - Average
LUMBER-post, pressure treat 4" x 6" LinFt $7.25 $ - $ - Average
LUMBER-post, pressure treat 6" x 6" LinFt $14.25 $ - $ - Average
LUMBER-pressure treated boards BdFt $3.00 $ - $ - Average
EROSION CONTROL MATTING - LONG TERM-TRM OR 700 GRAM COIR SqYd $10.50 $ - $ - Average
EROSION CONTROL MATTING - TEMP, 12 MONTHS or less LONGEVITY SqYd $2.75 $ - $ - Average
EROSION CONTROL MATTING - TEMP, 18-36 MONTHS LONGEVITY SqYd $4.80 $ - $ - Average
EROSION CONTROL MATTING - TEMP, < 400 SQ FT, STRAW -12 MONTHS OR LESS LONGEVITY SqFt $0.39 $ - $ - Average
MICROIRRIGATION SYSTEM Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $33,492.00 $40,190.00 Actual
Snow/Ice Guard LinFt $25.75 $ - $ - Average
STEEL-reinforce, wire fabric/rebar Lb $3.25 $ - $ - Average
STONE-Boulders (installed) Ton $168.25 $ - $ - Average
STONE-gravel Ton $65.75 $ - $ - Average
STONE-riprap Ton $90.75 $ - $ - Average
STREAM DEBRIS REMOVAL Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $17,250.00 $20,700.00 Actual
STREAM RESTORATION Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $55,820.00 $66,984.00 Actual
SITE EXCLUSION FENCE - includes gates and signs LinFt $2.75 Average
Pipes and Trash Guards
NOTE: PIPE - CORRUGATED METAL, CORRUGATED ALUMINUM, REINFORCED CONCRETE (RCP), CORRUGATED STORMWATER Where excavation and backfill are included, an assumed volume is calculated by pipe diameter plus 3' wide by pipe diameter plus 2' deep per linear foot (EX. 24" pipe would be 5' wide x4' deep per linear foot).
Component Unit Type WESTERN REGION Unit Cost CENTRAL REGION Unit Cost EASTERN REGION Unit Cost Maximum Cost Share 75 Percent Maximum Cost Share 90 Percent Cost Type
PIPE FITTING-Corrugated Polyethylene 4" Each $11.25 $ - $ - Average
PIPE FITTING-Corrugated Polyethylene 5" Each $12.00 $ - $ - Average
PIPE FITTING-Corrugated Polyethylene 6" Each $16.25 $ - $ - Average
PIPE FITTING-Corrugated Polyethylene 8" Each $41.75 $ - $ - Average
PIPE FITTING-Corrugated Polyethylene 10" Each $56.75 $ - $ - Average
PIPE FITTING-Corrugated Polyethylene 12" Each $71.50 $ - $ - Average
PIPE FITTING-Corrugated Polyethylene 15" Each $119.00 $ - $ - Average
PIPE FITTING-Corrugated Polyethylene 18" Each $239.00 $ - $ - Average
PIPE FITTING-Polyvinyl Chloride <=3" Each $9.75 $ - $ - Average
PIPE FITTING-Polyvinyl Chloride 4" Each $20.00 $ - $ - Average
PIPE FITTING-Polyvinyl Chloride 6" Each $56.25 $ - $ - Average
PIPE FITTING-Polyvinyl Chloride 8" Each $126.75 $ - $ - Average
PIPE FITTING-Polyvinyl Chloride 10" Each $539.75 $ - $ - Average
PIPE FITTING-Polyvinyl Chloride 12" Each $811.25 $ - $ - Average
PIPE FITTING-stormwater 12" Each $240.75 $ - $ - Average
PIPE FITTING-stormwater 24" Each $716.25 $ - $ - Average
PIPE-bent support for outlet Each $172.00 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized and bituminous coated with paved invert, 16 ga., 8"- includes excavation and backfill LinFt $48.00 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized and bituminous coated with paved invert, 16 ga., 10"- includes excavation and backfill LinFt $50.75 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized and bituminous coated with paved invert, 16 ga., 12"- includes excavation and backfill LinFt $58.50 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized and bituminous coated with paved invert, 16 ga., 15"- includes excavation and backfill LinFt $60.00 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized and bituminous coated with paved invert, 16 ga., 18"- includes excavation and backfill LinFt $68.75 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized and bituminous coated with paved invert, 16 ga., 24"- includes excavation and backfill LinFt $74.75 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized and bituminous coated with paved invert, 16 ga., 48"- includes excavation and backfill LinFt $134.25 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized and bituminous coated with paved invert, 16 ga., 60"- includes excavation and backfill LinFt $198.00 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized and bituminous coated with paved invert, 16 ga., 72"- includes excavation and backfill LinFt $251.25 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 16 ga., 6" - includes excavation and backfill LinFt $50.50 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 16 ga., 8" - includes excavation and backfill LinFt $52.75 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 16 ga., 10" - includes excavation and backfill LinFt $54.50 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 16 ga., 12" - includes excavation and backfill LinFt $63.00 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 16 ga., 15" - includes excavation and backfill LinFt $68.75 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 16 ga., 18" - includes excavation and backfill LinFt $70.75 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 14 ga., 21" - includes excavation and backfill LinFt $83.50 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 14 ga., 24" - includes excavation and backfill LinFt $96.25 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 14 ga., 27" - includes excavation and backfill LinFt $104.50 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 14 ga., 30" - includes excavation and backfill LinFt $112.75 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 12 ga., 36" - includes excavation and backfill LinFt $164.75 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 12 ga., 42" - includes excavation and backfill LinFt $187.75 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 12 ga., 48" - includes excavation and backfill LinFt $210.50 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 12 ga., 54" - includes excavation and backfill LinFt $265.50 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 12 ga., 60" - includes excavation and backfill LinFt $289.00 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 12 ga., 66" - includes excavation and backfill LinFt $314.00 $ - $ - Average
PIPE- CORRUGATED ALUMINUM, 12 ga., 72" - includes excavation and backfill LinFt $341.00 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 16 ga., 8" - includes excavation and backfill LinFt $48.75 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 16 ga., 10" - includes excavation and backfill LinFt $50.50 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 16 ga., 12" - includes excavation and backfill LinFt $67.50 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 16 ga., 15" - includes excavation and backfill LinFt $77.00 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 16 ga., 18" - includes excavation and backfill LinFt $83.00 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 14 ga., 21" - includes excavation and backfill LinFt $68.75 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 14 ga., 24" - includes excavation and backfill LinFt $88.75 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 14 ga., 27" - includes excavation and backfill LinFt $79.00 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 14 ga., 30" - includes excavation and backfill LinFt $104.75 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 12 ga., 36" - includes excavation and backfill LinFt $111.00 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 12 ga., 42" - includes excavation and backfill LinFt $125.25 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 12 ga., 48" - includes excavation and backfill LinFt $139.50 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 12 ga., 54" - includes excavation and backfill LinFt $172.00 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 10 ga., 60" - includes excavation and backfill LinFt $204.25 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 12 ga., 66" - includes excavation and backfill LinFt $223.50 $ - $ - Average
PIPE- CORRUGATED METAL, galvanized uncoated, 10 ga., 72" - includes excavation and backfill LinFt $242.50 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, single wall, 4" - does not include excavation LinFt $5.75 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, single wall, 6" - does not include excavation LinFt $8.75 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, single wall, 8" - does not include excavation LinFt $14.00 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, single wall, 10" - does not include excavation LinFt $17.75 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, single wall, 12" - does not include excavation LinFt $23.25 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, double wall, 15" - does not include excavation LinFt $27.25 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, double wall, 18" - does not include excavation LinFt $40.50 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, double wall, 24" - does not include excavation LinFt $63.00 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, double wall, 36" - does not include excavation LinFt $84.00 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, double wall, 42" - does not include excavation LinFt $138.50 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, double wall, 48" - does not include excavation LinFt $153.50 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, double wall, 54" - does not include excavation LinFt $205.25 $ - $ - Average
PIPE- CORRUGATED PLASTIC, polyethylene, double wall, 60" - does not include excavation LinFt $257.00 $ - $ - Average
PIPE-Hickenbottom INLET 6in - perforated riser section, non-perforated riser section, restrictor, and blind tee Each $216.25 $ - $ - Average
PIPE-Hickenbottom INLET 8in - perforated riser section, non-perforated riser section, restrictor, and blind tee Each $304.00 $ - $ - Average
PIPE-Hickenbottom INLET 10in - perforated riser section, non-perforated riser section, restrictor, and blind tee Each $404.00 $ - $ - Average
PIPE-Surface inlet tee (6 in) Each $69.00 $ - $ - Average
PIPE-Surface inlet tee (8 in) Each $96.50 $ - $ - Average
PIPE-Surface inlet tee (10 in) Each $220.50 $ - $ - Average
PIPE- Perf drain w/ GEOTEXTILE FILTER, INCLUDES EXCAVATION/BACKFILL OF 2'X3' PER LF LinFt $8.00 $ - $ - Average
PIPE- Perf drain w/ 2'X2' GRAVEL FILTER, INCLUDES EXCAVATION/BACKFILL OF 2'X3' PER LF LinFt $19.25 $ - $ - Average
PIPE-Perf drain w/o filter, INCLUDES EXCAVATION/BACKFILL OF 2'X3' PER LF LinFt $6.50 $ - $ - Average
PIPE-Polyvinyl Chloride 1 1/2" or less (does not include excavation) LinFt $4.25 $ - $ - Average
PIPE-Polyvinyl Chloride 2" (does not include excavation) LinFt $9.00 $ - $ - Average
PIPE-Polyvinyl Chloride 2.5" (does not include excavation) LinFt $12.00 $ - $ - Average
PIPE-Polyvinyl Chloride 3" (does not include excavation) LinFt $14.00 $ - $ - Average
PIPE-Polyvinyl Chloride 4" (does not include excavation) LinFt $11.50 $ - $ - Average
PIPE-Polyvinyl Chloride 5" (does not include excavation) LinFt $19.25 $ - $ - Average
PIPE-Polyvinyl Chloride 6" (does not include excavation) LinFt $20.50 $ - $ - Average
PIPE-Polyvinyl Chloride 8" (does not include excavation) LinFt $23.00 $ - $ - Average
PIPE-Polyvinyl Chloride 10" (does not include excavation) LinFt $25.25 $ - $ - Average
PIPE-Polyvinyl Chloride 12" (does not include excavation) LinFt $28.75 $ - $ - Average
PIPE-Polyvinyl Chloride, quick coupling 3/4"-1" Each $38.75 $ - $ - Average
PIPE- PE Water supply/fittings, <=2in, includes trenching LinFt $4.00 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 12" - includes excavation and backfill LinFt $66.25 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 15" - includes excavation and backfill LinFt $72.00 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 18" - includes excavation and backfill LinFt $78.00 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 21" - includes excavation and backfill LinFt $84.50 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 24" - includes excavation and backfill LinFt $102.00 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 30" - includes excavation and backfill LinFt $164.75 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 36" - includes excavation and backfill LinFt $226.25 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 42" - includes excavation and backfill LinFt $286.75 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 48" - includes excavation and backfill LinFt $347.50 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 54" - includes excavation and backfill LinFt $403.00 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 60" - includes excavation and backfill LinFt $458.25 $ - $ - Average
PIPE- REINFORCED CONCRETE (RCP), class 3, 72" - includes excavation and backfill LinFt $569.00 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL, 4" - includes excavation and backfill LinFt $37.75 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 6" - includes excavation and backfill LinFt $40.00 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 8" - includes excavation and backfill LinFt $42.50 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL, 10" - includes excavation and backfill LinFt $49.00 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 12" - includes excavation and backfill LinFt $47.25 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 15" - includes excavation and backfill LinFt $49.00 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 18" - includes excavation and backfill LinFt $71.50 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 24" - includes excavation and backfill LinFt $95.75 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 30" - includes excavation and backfill LinFt $118.50 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 36" - includes excavation and backfill LinFt $140.00 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 42" - includes excavation and backfill LinFt $170.50 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 48" - includes excavation and backfill LinFt $186.75 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 54" - includes excavation and backfill LinFt $240.00 $ - $ - Average
PIPE-CORRUGATED STORMWATER, TYPE S, SMOOTH WALL , 60" - includes excavation and backfill LinFt $293.50 $ - $ - Average
FACE PLATE alum. 12"-18"-INSTALLED Each $1,461.50 $ - $ - Average
ANIMAL GUARD - Band type Each $187.00 $ - $ - Average
ANIMAL GUARD - Inside type Each $157.00 $ - $ - Average
TRASH GD-Corrugated Aluminum 15" Each $609.00 $ - $ - Average
TRASH GD-Corrugated Aluminum 24" Each $743.00 $ - $ - Average
TRASH GD-Corrugated Aluminum 30" Each $670.00 $ - $ - Average
TRASH GD-Corrugated Aluminum 36" Each $962.00 $ - $ - Average
TRASH GD-Corrugated Aluminum 48" Each $1,062.00 $ - $ - Average
TRASH GD-Corrugated Aluminum 54" Each $1,163.00 $ - $ - Average
TRASH GD-Polyvinyl Chloride/Coated Corrugated Steel/steel 12" Each $121.75 $ - $ - Average
TRASH GD-Polyvinyl Chloride/Coated Corrugated Steel/steel 15" Each $144.00 $ - $ - Average
TRASH GD-Polyvinyl Chloride/Coated Corrugated Steel/steel 18" Each $177.25 $ - $ - Average
TRASH GD-Polyvinyl Chloride/Coated Corrugated Steel/steel 24" Each $254.75 $ - $ - Average
TRASH GD-Polyvinyl Chloride/Coated Corrugated Steel/steel 30" Each $321.25 $ - $ - Average
TRASH GD-Polyvinyl Chloride/Coated Corrugated Steel/steel 36" Each $432.00 $ - $ - Average
TRASH GD-Polyvinyl Chloride/Coated Corrugated Steel/steel 42" Each $653.50 $ - $ - Average
TRASH GD-Polyvinyl Chloride/Coated Corrugated Steel/steel 48" Each $697.75 $ - $ - Average
TRASH GD-Polyvinyl Chloride/Coated Corrugated Steel/steel 60" Each $1,163.00 $ - $ - Average
TRASH GD-Polyvinyl Chloride/Coated Corrugated Steel/steel 72" Each $1,661.50 $ - $ - Average
Establishment of Trees and Riparian Buffers
Component Unit Type WESTERN REGION Unit Cost CENTRAL REGION Unit Cost EASTERN REGION Unit Cost Maximum Cost Share 75 Percent Maximum Cost Share 90 Percent Cost Type
TREE ESTABLISHMENT - Bedding (Cropland Conversion to Trees ONLY) Acre $100.00 $ - $ - Average
TREE ESTABLISHMENT - Chemical Release Acre $110.00 $ - $ - Average
TREE ESTABLISHMENT - Chemical Site Prep Acre $145.00 $ - $ - Average
TREE ESTABLISHMENT - Disking Acre $75.00 $ - $ - Average
TREE ESTABLISHMENT - Mowing/Bushhogging Acre $75.00 $ - $ - Average
TREE ESTABLISMENT - Prescribed Burning Acre $70.00 $ - $ - Average
TREE ESTABLISHMENT - Scalping/Furrowing Acre $115.00 $ - $ - Average
TREE ESTABLISHMENT - Subsoiling Acre $75.00 $ - $ - Average
TREE-planting Acre $148.00 $ - $ - Average
Establishment of Vegetation, Pasture Renovation and Cropland Conversion (Grass)
Component Unit Type WESTERN REGION Unit Cost CENTRAL REGION Unit Cost EASTERN REGION Unit Cost Maximum Cost Share 75 Percent Maximum Cost Share 90 Percent Cost Type
COVER CROP Acre $80.00 $ - $ - Average
RESIDUE AND TILLAGE MANAGEMENT - Tier 1 - 60% Residue Acre $23.00 $ - $ - Average
RESIDUE AND TILLAGE MANAGEMENT - Tier 2 - 80%Residue Acre $46.00 $ - $ - Average
RESIDUE AND TILLAGE MANAGEMENT - Tier 3 - Conventional 60% Residue Acre $138.00 $ - $ - Average
RESIDUE AND TILLAGE MANAGEMENT - Tier 4 - Conventional 80% Residue Acre $161.00 $ - $ - Average
SOD-BASED ROTATION - Tier 1 - 3 yr/17 mos Acre $113.00 $ - $ - Average
SOD-BASED ROTATION - Tier 2 - 4 yr/29 mos Acre $196.00 $ - $ - Average
SOD-BASED ROTATION - Tier 3 - 5 yr/41 mos Acre $264.00 $ - $ - Average
CROPLAND CONVERSION - establish grass or wildlife planting, includes land preparation Acre $476.00 $ - $ - Average
PASTURE RENOVATION Acre $427.00 $ - $ - Average
VEGETATION-bag lime, seed and fertlizer Acre $1,122.00 $ - $ - Average
VEGETATION-Tree/Shrub Bare Root Seedlings Each $4.60 $ - $ - Average
VEGETATION-bulk lime, seed and fertilizer Acre $882.00 $ - $ - Average
VEGETATION-compost blanket SqFt Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $5,666.00 $6,799.50 Actual
VEGETATION-compost sock LinFt $6.50 $ - $ - Actual
VEGETATION-Stripcropping Acre $237.00 $ - $ - Average
VEGETATION-establish, Christmas tree plantations Acre $332.00 $ - $ - Average
VEGETATION-Hydroseed, includes lime, seed, fertilizer Acre $2,726.00 $ - $ - Average
VEGETATION-establish, native species for riparian areas only Acre $863.00 $ - $ - Average
VEGETATION-Livestakes (installed) Each $4.00 $ - $ - Average
VEGETATION-mulch, small grain straw Acre $2,200.00 $ - $ - Average
VEGETATION- mulch netting installed SqYd $1.00 $ - $ - Average
VEGETATION-seedbed prep Acre $161.00 $ - $ - Average
Grading and Earth Moving Components
Component Unit Type WESTERN REGION Unit Cost CENTRAL REGION Unit Cost EASTERN REGION Unit Cost Maximum Cost Share 75 Percent Maximum Cost Share 90 Percent Cost Type
EARTH FILL- ADJACENT (WITHIN 300 YDS) CuYd $6.75 $ - $ - Average
EARTH FILL ADJACENT, COMPACTED CuYd $8.50 $ - $ - Average
EARTH FILL HAULED CuYd $39.00 $ - $ - Average
EARTH FILL HAULED, COMPACTED CuYd $41.50 $ - $ - Average
EXCAVATION- Spring development/Stream Pickup Hr $188.00 $ - $ - Average
EXCAVATION CuYd $4.15 $ - $ - Average
GRADING-medium, <=6" avg Acre $3,810.00 $ - $ - Average
GRADING-heavy, 6"-9" avg Acre $4,535.00 $ - $ - Average
GRADING-extra heavy 9"-12" avg Acre $5,260.00 $ - $ - Average
GRADING-maximum heavy >12" avg Acre $5,984.00 $ - $ - Average
GRADING-minimum, <=1/4 acre Job $3,123.00 $ - $ - Average
HUAP- fine grading, geotextile, stone (does not include grading/excavation)1, 2, 3, 4 ,5 ,6 SqYd $31.00 $ - $ - Average
HUAP-fine grading, concrete (does not include grading/excavation)1, 2 ,3 ,4 SqYd $103.00 $ - $ - Average
HUAP-for tanks and troughs: fine grading (does not include grading/excavation), geotextile, stone, 44.4 SqYd (400 SqFt)1, 2 ,3 ,4 ,5 ,6 Each $1,370.00 $ - $ - Average
HUAP- for tanks and troughs: fine grading (does not include grading/excavation), concrete, 44.4 SqYd (400 SqFt)1, 2, 3, 4 Each $4,559.00 $ - $ - Average
PRECISION LAND FORMING Acre $362.50 $362.50 $453.00 $ - $ - Average
SMOOTH/SHAPE-tractor disk/blade Acre $453.00 $ - $ - Average
Incentives
Component Unit Type WESTERN REGION Unit Cost CENTRAL REGION Unit Cost EASTERN REGION Unit Cost Maximum Cost Share 75 Percent Maximum Cost Share 90 Percent Cost Type
INCENTIVE - Manure/Litter Transport <= 20 mi. Ton / CuYd $5.00 / $4.25 $ 35,000.00 $ 35,000.00 Flat Rate
INCENTIVE - Manure/Litter Transport 20-50 mi. Ton / CuYd $9.25 / $7.75 $ 35,000.00 $ 35,000.00 Flat Rate
INCENTIVE - Manure/Litter Transport >= 50 mi. Ton / CuYd $18.50 / 15.75 $ 35,000.00 $ 35,000.00 Flat Rate
INCENTIVE - Nutrient Management 3yrs Acre/ Year $15.00 $ - $ - Flat Rate
INCENTIVE - Precision Nutrient Management Acre/ Year $25.00 $ 15,000.00 $ 15,000.00 Flat Rate
INCENTIVE - Prescribed Grazing Acre/ Year $35.00 $ 15,000.00 $ 15,000.00 Flat Rate
Stream Protection Management
Component Unit Type WESTERN REGION Unit Cost CENTRAL REGION Unit Cost EASTERN REGION Unit Cost Maximum Cost Share 75 Percent Maximum Cost Share 90 Percent Cost Type
FENCE - SOLAR CHARGER Each $401.00 $ - $ - Average
FENCE-3-strand perm, electric, incl. Gates LinFt $5.22 $ - $ - Average
FENCE-4+-strand perm, electric, incl. Gates LinFt $5.69 $ - $ - Average
FENCE-perm, 3 strand interior, electric or non- electric, incl. Gates LinFt $5.02 $ - $ - Average
FENCE-perm, non-electric, incl. Gates LinFt $6.59 $ - $ - Average
FENCE-1-2 strand perm, electric or barbed, incl. Gates LinFt $4.70 $ - $ - Average
FENCE-temporary, portable, electric LinFt $0.22 $ - $ - Average
LIVESTOCK FEEDING AREA (Concrete and Grading - NO EXCAVATION (Average of each per SQ YD)) SqYd Cost Share percent of actual amount Cost Share percent of actual amount Cost Share percent of actual amount $101.00 $121.50 Actual
LIVESTOCK FEEDING AREA -Pushwall including concrete waste blocks, No. 57 stone and geotextile Each Cost Share percent of actual amount Cost Share percent of actual amount Cost Share percent of actual amount $3,307.00 $3,968.00 Actual
PUMP-housing, fiberglass/site built Each $560.00 $ - $ - Average
PUMP-solar powered water Each Cost Share percent of actual amount Cost Share percent of actual amount Cost Share percent of actual amount $5,350.00 $6,420.00 Actual
PUMP-water supply (includes installation of the pump, pressure tank, and connection to the power supply) Each Cost Share percent of actual amount Cost Share percent of actual amount Cost Share percent of actual amount $4,100.00 $4,920.00 Actual
Spring Header Casing Each $723.35 $ - $ - Average
STOCK TRAIL- fine grading, geotextile, stone (does not include excavation) SqYd $31.00 $ - $ - Average
STOCK TRAIL- fine grading, establish vegetation SqYd $6.00 $ - $ - Average
STREAM PROTECTION WELL-construction/head protection LinFt $27.00 $30.00 $27.00 $ - $ - Average
STREAM PROTECTION WELL-permit (only where agriculture is not exempt from well permit fees) Each Cost Share percent of actual amount Cost Share percent of actual amount Cost Share percent of actual amount $500.00 $600.00 Actual
STREAM PROTECTION WELL- Steel casing LinFt Cost Share percent of actual amount Cost Share percent of actual amount Cost Share percent of actual amount $25.00 $30.00 Actual
TANK-temp storage, 1000 gal Each $1,813.00 $ - $ - Average
TANK-temp storage, 1500 gal Each $2,129.00 $ - $ - Average
TANK-temp storage, 2500 gal Each $2,675.00 $ - $ - Average
TANK- watering (fixed) Continuous Flow Concrete Tank Each $2,208.00 $ - $ - Average
TANK- watering (fixed) Non-Continuous Flow Concrete Tank Each $1,867.00 $ - $ - Average
TANK-watering (fixed)/Pressurized 1- or 2-Hole Watering Tank (<15 gal.) Each $1,061.00 $ - $ - Average
TANK-watering (fixed)/Pressurized 1- or 2-Hole Watering Tank (<15 gal.), concrete pad7 Each $1,605.00 $ - $ - Average
TANK-watering (fixed)/Pressurized 2-Hole Watering Tank (20 - 28 gal.) Each $1,304.00 $ - $ - Average
TANK-watering (fixed)/Pressurized 2-Hole Watering Tank (20 - 28 gal.), concrete pad7 Each $1,848.00 $ - $ - Average
TANK-watering (fixed)/Pressurized 4-Hole Watering Tank (33 gal.) Each $1,410.00 $ - $ - Average
TANK-watering (fixed)/Pressurized 4-Hole Watering Tank (33 gal.), concrete pad7 Each $1,954.00 $ - $ - Average
TANK-watering (fixed)/Pressurized 2-Hole Watering Tank (44 gal.) Each $1,534.00 $ - $ - Average
TANK-watering (fixed)/Pressurized 2-Hole Watering Tank (44 gal.), concrete pad7 Each $2,078.00 $ - $ - Average
TANK-watering (fixed)/Pressurized 4-Hole Watering Tank (70 gal.) Each $1,782.00 $ - $ - Average
TANK-watering (fixed)/Pressurized 4-Hole Watering Tank (70 gal.), concrete pad7 Each $2,323.25 $ - $ - Average
TANK-watering (portable) /Pressurized Waterer Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $558.00 $669.50 Actual
VALVE-float, automatic, brass Each $75.50 $ - $ - Average
VALVE BOX-Plastic Each $140.75 $ - $ - Average
WATER SUPPLY-Municipal tap Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $2,632.50 $3,159.00 Actual
Waste Management Measures
Component Unit Type WESTERN REGION Unit Cost CENTRAL REGION Unit Cost EASTERN REGION Unit Cost Maximum Cost Share 75 Percent Maximum Cost Share 90 Percent Cost Type
COMPOSTER BINS ONLY -wood, inside or outside storage structure, area of bin SqFt $10.76 $ - $ - Average
COMPOSTER-lumber/roof SqFt $19.00 $16.00 $16.00 $ - $ - Average
DRY STACK-dairy/beef/poultry, block SqFt $16.50 $ - $ - Average
DRY STACK-dairy/beef/poultry, wood/metal SqFt $21.25 $18.00 $18.00 $ - $ - Average
DRY STACK-truss arch, fabric roofed SqFt $10.50 $ - $ - Average
FEEDING/WASTE STRUCTURE Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $50,000.00 $60,000.00 Actual
FORCED AERATION COMPOST SYSTEM <720 sq ft w/Grinder and Storage SqFt $383.00 $ - $ - Average
FORCED AERATION COMPOST SYSTEM 720 sq ft to 1440 sq ft w/Grinder and Storage SqFt $299.00 $ - $ - Average
FORCED AERATION COMPOST SYSTEM >1450 sq ft w/ Grinder and Storage SqFt $252.00 $ - $ - Average
FORCED AERATION COMPOST SYSTEM 600 sq ft to 1450 sq ft w/ Storage SqFt $271.00 $ - $ - Average
FORCED AERATION COMPOST SYSTEM >1450 sq ft w/ Storage SqFt $233.00 $ - $ - Average
FREEZER-Manufactured Unit, Installed Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $5,020.00 $6,024.00 Actual
GASIFICATION - 275 lb Corrugated Aluminumacity (delivered & installed) Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $34,804.00 $41,764.50 Actual
GASIFICATION - 400 lb Corrugated Aluminumacity (delivered & installed) Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $43,957.00 $52,748.00 Actual
GASIFICATION - 800 lb Corrugated Aluminumacity (delivered & installed) Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $55,715.00 $66,858.00 Actual
GASIFICATION - 1,200 lb Corrugated Aluminumacity (delivered & installed) Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $61,424.00 $73,709.00 Actual
INCINERATOR <= 250 lb Capacity - includes concrete slab and electrical service Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $16,411.00 $19,693.00 Actual
INCINERATOR 400-500 lb Capacity - includes concrete slab and electrical service Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $18,755.00 $22,506.00 Actual
INCINERATOR 600-700 lb Capacity - includes concrete slab and electrical service Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $21,351.00 $25,621.00 Actual
INCINERATOR 800 - 1000 lb Capacity- includes concrete slab and electrical service Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $23,779.00 $28,534.50 Actual
INCINERATOR >1,000 lb Capacity - includes concrete slab and electrical service Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $29,222.00 $35,066.50 Actual
INCINERATOR-Roof w/ storm collar SqFt $24.50 $ - $ - Actual
Lagoon Biosolids Removal Gallon $0.04 $50,000.00 $50,000.00 Flat Rate
Retrofit of On-going Animal Operation Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $ 75,000.00 $ 90,000.00 Actual
Retrofit of On-going Animal Operation - CLOSURE Gallon $0.04 $ - $ - Flat Rate
Retrofit of On-going Animal Operation - CLOSURE: Stabilization for Breach/Freshwater Pond Conversion Job $4,000 $ - $ - Flat Rate
ROTARY DRUMS-2900 gal, w/drive motor Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $22,328.00 $26,793.60 Actual
ROTARY DRUMS-2900 gal, w/forced aeration system Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $27,910.00 $33,492.00 Actual
SOLIDS SEPARATION FROM TANK-BASED AQUACULTURE Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $41,865.00 $50,238.00 Actual
WASTE APPLICATION - Poultry litter spreader Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $25,125.00 $30,150.00 Actual
WASTE APPLICATION - Manure spreader Each Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $33,525.00 $40,230.00 Actual
WASTE APPLICATION - System Job Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed Cost Share percent of actual amount not to exceed $ 50,000.00 $ 60,000.00 Actual
WASTE IMPOUNDMENT CLOSURE Gallon $0.04 $ 75,000.00 $ 90,000.00 Flat Rate
WASTE IMPOUNDMENT CLOSURE – Stabilization for Breach/Freshwater Pond Conversion Job $4,000 $ 75,000.00 $ 90,000.00 Flat Rate
Water Control Structures
Component Unit Type WESTERN REGION Unit Cost CENTRAL REGION Unit Cost EASTERN REGION Unit Cost Maximum Cost Share 75 Percent Maximum Cost Share 90 Percent Cost Type
ANTISEEP COLL-alum, 12"-18" pipe Each $792.00 $ - $ - Average
ANTISEEP COLL-alum, 24" pipe Each $1,230.00 $ - $ - Average
ANTISEEP COLL-alum, 30" pipe Each $1,522.00 $ - $ - Average
ANTISEEP COLL-alum, 36" pipe Each $1,815.00 $ - $ - Average
ANTISEEP COLL-alum, 42" pipe Each $2,107.00 $ - $ - Average
ANTISEEP COLL-alum, 48" pipe Each $2,399.00 $ - $ - Average
ANTISEEP COLL-alum, 54" pipe Each $2,691.00 $ - $ - Average
ANTISEEP COLL-alum, 60" pipe Each $2,984.00 $ - $ - Average
ANTISEEP COLL-alum, 72" pipe Each $3,568.00 $ - $ - Average
FLAP GATE-Corrugated Plastic Pipe 18" Each $452.00 $ - $ - Average
FLAP GATE-Corrugated Plastic Pipe 24" Each $686.00 $ - $ - Average
FLAP GATE-Corrugated Plastic Pipe 30" Each $951.00 $ - $ - Average
FLAP GATE-Corrugated Plastic Pipe 36" Each $1,174.00 $ - $ - Average
FLAP GATE-Corrugated Metal Pipe 18" Each $585.00 $ - $ - Average
FLAP GATE-Corrugated Metal Pipe 24" Each $856.00 $ - $ - Average
FLAP GATE-Corrugated Metal Pipe 30" Each $1,197.00 $ - $ - Average
FLAP GATE-Corrugated Metal Pipe 36" Each $1,458.00 $ - $ - Average
GATE-shear, alum, 10'x3/4" lift rod Each $280.00 $ - $ - Average
GATE-shear, Coated Corrugated Steel w/ frame/rod 6" Each $750.00 $ - $ - Average
GATE-shear, Coated Corrugated Steel w/ frame/rod 8" Each $792.00 $ - $ - Average
GATE-shear, Coated Corrugated Steel w/ frame/rod 10" Each $932.00 $ - $ - Average
GATE-shear, Coated Corrugated Steel w/ frame/rod 12" Each $1,627.00 $ - $ - Average
GATE-shear, Polyvinyl Chloride pipe Each $622.00 $ - $ - Average
GATE-slide, Polyvinyl Chloride pipe 8" Each $1,064.00 $ - $ - Average
GATE-slide, Polyvinyl Chloride pipe 12" Each $2,192.00 $ - $ - Average
HEADWALL-aluminum SqFt $134.00 $ - $ - Average
HEADWALL-concrete - includes steel reinforcement CuYd $773.00 $ - $ - Average
HEADWALL-sand cement bag >=60 lb Bag $10.00 $ - $ - Average
RISER-Corrugated Aluminum 15"-18"/16 ga LinFt $635.00 $ - $ - Average
RISER-Corrugated Aluminum 21"-24"/16 ga LinFt $658.00 $ - $ - Average
RISER-Corrugated Aluminum 30"-36"/14 ga LinFt $687.00 $ - $ - Average
RISER-Corrugated Aluminum perf 15"-18"/16 ga LinFt $709.00 $ - $ - Average
RISER-Corrugated Aluminum perf 21"-24"/16 ga LinFt $738.00 $ - $ - Average
RISER-Corrugated Aluminum perf 30"-36"/14 ga LinFt $807.00 $ - $ - Average
RISER-Coated Corrugated Steel 8"-12"/16 ga LinFt $584.00 $ - $ - Average
RISER-Coated Corrugated Steel 15"-21"/16 ga LinFt $692.00 $ - $ - Average
RISER-Coated Corrugated Steel 24"-30"/16 ga LinFt $749.00 $ - $ - Average
RISER-Coated Corrugated Steel 36"-48"/14 ga LinFt $824.00 $ - $ - Average
RISER-Coated Corrugated Steel 54"/12 ga LinFt $875.00 $ - $ - Average
RISER-Coated Corrugated Steel perf 15"-21"/16 ga LinFt $721.00 $ - $ - Average
RISER-Coated Corrugated Steel perf 24"-30"/16 ga LinFt $772.00 $ - $ - Average
RISER-Coated Corrugated Steel perf 36"-48"/14 ga LinFt $875.00 $ - $ - Average
RISER-Coated Corrugated Steel perf 54"/12 ga LinFt $927.00 $ - $ - Average
RISER-fb .175in plate 102in (5' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $23,105.00 $ - $ - Average
RISER-fb .175in plate 108in (5' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $25,918.00 $ - $ - Average
RISER-fb .175in plate 114in (5' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $28,914.00 $ - $ - Average
RISER-fb .175in plate 120in (5' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $32,092.00 $ - $ - Average
RISER-fb 18" x 5' (4' water ht) Aluminum Flashboard Riser w/ 2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $2,838.00 $ - $ - Average
RISER-fb 24" x 5' (4' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $3,106.00 $ - $ - Average
RISER-fb 30" x 5' (4' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $3,550.00 $ - $ - Average
RISER-fb 36" x 5' (4' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $4,184.00 $ - $ - Average
RISER-fb 42" x 5' (4' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $4,987.00 $ - $ - Average
RISER-fb 48" x 5' (4' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $5,980.00 $ - $ - Average
RISER-fb 54" x 5' (4' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $7,155.00 $ - $ - Average
RISER-fb 60" x 5' (4' water ht) Aluminum Flashboard Riser w/ 2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $8,510.00 $ - $ - Average
RISER-fb 66" x 5' (4' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $10,048.00 $ - $ - Average
RISER-fb 72" x 6' (5' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $11,769.00 $ - $ - Average
RISER-fb 78in/12 ga (5' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $13,672.00 $ - $ - Average
RISER-fb 84in/10 ga (5' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $15,757.00 $ - $ - Average
RISER-fb 90in/10 ga (5' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $18,024.00 $ - $ - Average
RISER-fb 96in/10 ga (5' water ht) Aluminum Flashboard Riser w/2' Flanged Stub, Includes: Pressure Treated Pine Tongue & Groove Boards & Trash Guard Each $20,473.00 $ - $ - Average
WATER CONTROL STRUCTURE - Automated Valve - locally programmable Each $7,600.00 $ - $ - Average
WATER CONTROL STRUCTURE - Automated Valve - fully programmable Each $8,600.00 $ - $ - Average
WATER CONTROL STRUCTURE in-line, installed 6"x4' Each $1,361.00 $ - $ - Average
WATER CONTROL STRUCTURE in-line, installed 6"x5' Each $1,513.00 $ - $ - Average
WATER CONTROL STRUCTURE in-line, installed 6"x6' Each $1,730.00 $ - $ - Average
WATER CONTROL STRUCTURE in-line, installed 8"x4' Each $1,367.00 $ - $ - Average
WATER CONTROL STRUCTURE in-line, installed 8"x5' Each $1,547.00 $ - $ - Average
WATER CONTROL STRUCTURE in-line, installed 8"x6' Each $1,820.00 $ - $ - Average
WATER CONTROL STRUCTURE in-line, installed WATERGATE 8 in Each $1,803.00 $ - $ - Average
WATER CONTROL STRUCTURE in-line, installed WATERGATE 10 in Each $1,125.00 $ - $ - Average

For actual cost items, the payment is based on 75 or 90 percent of actual cost, not to exceed the established cost share cap. The cost share cap listed is the maximum amount of cost share reimbursement allowed for that component/BMP.
*Local Soil & Water Conservation Districts can set more restrictive costs or caps in their annual strategic before any current year contracts are approved.

Footnotes

1- Planners may use this components instead of itemizing the individual costs separately. This item was created following the NRCS standard and represents the average livestock watering system used in ACSP. Only the items listed are included in the average cost. Any additional items should be contracted separately.

2- The sized HUAP components are based on the minimum size of 20' x 20'. For larger areas planners may add the SqYd component to cover the excess area. For example, for a 25' x 25' gravel HUAP, the components would be: 1 unit (EACH) HUAP-for tanks and troughs: fine grading (does not include excavation), geotextile, stone, 44.4 SqYd (400 SqFt) and 25 units (SqYd) HUAP- fine grading, geotextile, stone (does not include excavation).

3- Fine grading or finish grading includes the smoothing of the pad and area around the pad equal to ½ the pad size.

4- Excavation and grading are site dependent. The planner should determine what type to use based on the site characteristics, such as topography and soil type.

5- The amount of stone included is to fill the stated volume 8" deep and compact to 6".

6- Geotextile costs include overlap.

7- The cost for a watering tank concrete pad is based on a pad size of 7' x 7'.